INTRODUCTION

ASSIGNED
CONSULTANT
~ PROFILE ~

CLIENTS & WORK
EXPERIENCE

SYSTEM
DOCUMENTATION
SAMPLES

Provided below is a partial list of companies and work performed:

 
General Motors Corporation, Cadillac Motor Car Division, Grand Blanc Plant ~ Grand Blanc, MI
Training in Statistical Process Control       
Training in Problem Solving        
Targets for Excellence

General Motors, Metal Fabrication Division Headquarters ~ Troy, Michigan
Technical Problem Solving of steel stamping processes, GMT-800 product line
Throughput increase, scrap reduction, metal formability issues

Jim Robbins Company ~ Troy, MI
Training in Statistical Process Control       
Training in Problem Solving

Quality Inspection Corporation ~ Flint, MI
Laboratory Manual to GP-10        
Laboratory Procedures

Toyo Seat USA Corporation ~ Hiroshima, Japan and Imlay City, MI
Quality Systems Manual to Q-101 
Quality System Procedures top Q-101        
Training in Statistical Process Control       
Training in Problem Solving        
Attainment of Q-1 Award

Lapeer Metal Products ~ Lapeer, MI
Training in Statistical Process Control       
Training in Problem Solving        
Laboratory and Test Facility Manual to GP-10 and ISO/IEC Guide 25 
ISO 9001 System Implementation

Delphi Steering Systems • Divisional Engineering & Advanced Product Systems ~ Saginaw MI
QS-9000 / ISO 9001 Systems Implementation         
Training Development for Phase 00

 
Delphi Chassis Systems, Central Inspection and Calibration Laboratory ~ Saginaw, MI
Laboratory and Test Facility Manual
Procedure Development
Work Instruction Development
Audit, Gap Analysis & Corrective Actions
Specialized Training in Understanding The Relationship of ISO/IEC Guide 25 to ISO 10011, ISO 9002 and QS-9000

Delphi Chassis Systems • Divisional Product Engineering ~ Saginaw, MI    
QS-9000 / ISO 9001 Systems Total Development and Implementationá                       
Work Instruction Development

Electronic Data Systems (EDS) Reliability Test Laboratory at Delphi Chassis Systems ~ Saginaw, MI
Laboratory and Test Facility Manual to GP-10, QS-9000, ISO 9002 and 
ISO/IEC Guide 25
Work Instruction Development
Training in QS-9000, ISO 9002, ISO/IEC Guide 25 & ISO 10011

Electronic Data Systems (EDS) Metalurgical Test Laboratory at Delphi Chassis Systems ~ Saginaw, MI
Audit, Gap Analysis & Corrective Actions to ISO/IEC Guide 25

Peregrine Incorporated of Canada ~ Oshawa
Peregrine Incorporated USA ~ Southfield
Peregrine Incorporated USA ~ Warren
Dimensional Validation of Manufactured Parts (CMM)
Physical Testing of Manufactured Products (life-cycle, crash test)
Calibration of Metrology
Metrology Repair
Records Storage

Machine Tool and Gear ~ Corunna, MI
QS-9000 / ISO 9001 Systems Total Development and Implementation
Inspection Laboratory Manual to ISO/IEC Guide 25
Metallurgical Laboratory Manual to ISO/IEC Guide 25
Training in Procedure and Work Instruction Development
Motivational Poster Development

Peregrine Incorporated, Coldwater Road Plant ~ Flint, MI
QS-9000 Systems Development and Implementation for Hinge Department
Plant Troubleshooter for Surveillance Audit
Training in Performance Testing
Training in Work Instruction Development

Aeronca, Inc. ~ Cincinnati, OH
AS9100 Total System Development and Implementation

Mackie Automotive Systems ~ Lake Orion, Michigan
Review and update of QS-9000 system

Empire Electrical ~ Auburn Hills, MI
ISO/TS 16949 Total Systems Development and Implementation

Hamlin Steel, Corp. ~ Cleveland, OH
Manual/procedures to ISO/TS 16949

Quasar Industries ~ Rochester, MI
ISO 9001 and ISO/TS 16949 Total Systems Development and Implementation

ICG ~ Dowogiac, MI
ISO/TS 16949 Total Systems Development and Implementation

Doveport Systems ~ Port Huron, Michigan
Development and implementation of physical test and dimensional validation laboratory

ND Industries ~ Clawson, Michigan
Laboratory and Test Facility Manual to ISO 17025
Procedure Development
Work Instruction Development

Summation Technology Systems ~ Warren, Michigan
Development of systems for collection ant testing of specimens for Warren District Drug Court.
Procedure Development
Work Instruction Development
Find and acquire equipment

Cornell Supply ~ Toledo, Ohio
ISO 9001:2000 Total System Development and Implementation

Norton Equipment ~ Blissfield, Michigan
Manual/procedures to ISO 9001-2000

Elco, Inc. ~ Jackson, Michigan
Manual/procedures to ISO 9001:2000

Bender Machine ~ Los Angeles, CA
Manual/procedures to ISO 9001:2000

Breasco, Inc ~ Ypsilanti, Michigan