General Motors, Metal Fabrication Division Headquarters
~ Troy, Michigan
Technical Problem Solving of steel stamping processes, GMT-800
product line
Throughput increase, scrap reduction, metal formability issues
Jim Robbins Company ~ Troy, MI
Training in Statistical Process Control
Training in Problem Solving
Quality Inspection Corporation ~ Flint,
MI
Laboratory Manual to GP-10
Laboratory Procedures
Toyo Seat USA Corporation ~ Hiroshima, Japan
and Imlay City, MI
Quality Systems Manual to Q-101
Quality System Procedures top Q-101
Training in Statistical Process Control
Training in Problem Solving
Attainment of Q-1 Award
Lapeer Metal Products ~ Lapeer, MI
Training in Statistical Process Control
Training in Problem Solving
Laboratory and Test Facility Manual to GP-10 and ISO/IEC Guide 25
ISO 9001 System Implementation
Delphi Steering Systems Divisional Engineering
& Advanced Product Systems ~ Saginaw MI
QS-9000 / ISO 9001 Systems Implementation
Training Development for Phase 00
Delphi Chassis Systems, Central Inspection and Calibration Laboratory
~ Saginaw, MI
Laboratory and Test Facility Manual
Procedure Development
Work Instruction Development
Audit, Gap Analysis & Corrective Actions
Specialized Training in Understanding The Relationship of ISO/IEC
Guide 25 to ISO 10011, ISO 9002 and QS-9000
Delphi Chassis Systems Divisional Product
Engineering ~ Saginaw, MI
QS-9000 / ISO 9001 Systems Total Development and Implementationá
Work Instruction Development
Electronic Data Systems (EDS) Reliability Test
Laboratory at Delphi Chassis Systems ~ Saginaw, MI
Laboratory and Test Facility Manual to GP-10, QS-9000, ISO 9002
and
ISO/IEC Guide 25
Work Instruction Development
Training in QS-9000, ISO 9002, ISO/IEC Guide 25 & ISO 10011
Electronic Data Systems (EDS) Metalurgical Test
Laboratory at Delphi Chassis Systems ~ Saginaw, MI
Audit, Gap Analysis & Corrective Actions to ISO/IEC Guide 25
Peregrine Incorporated of Canada ~ Oshawa
Peregrine Incorporated USA ~ Southfield
Peregrine Incorporated USA ~ Warren
Dimensional Validation of Manufactured Parts (CMM)
Physical Testing of Manufactured Products (life-cycle, crash test)
Calibration of Metrology
Metrology Repair
Records Storage
Machine Tool and Gear ~ Corunna, MI
QS-9000 / ISO 9001 Systems Total Development and Implementation
Inspection Laboratory Manual to ISO/IEC Guide 25
Metallurgical Laboratory Manual to ISO/IEC Guide 25
Training in Procedure and Work Instruction Development
Motivational Poster Development
Peregrine Incorporated, Coldwater Road Plant
~ Flint, MI
QS-9000 Systems Development and Implementation for Hinge Department
Plant Troubleshooter for Surveillance Audit
Training in Performance Testing
Training in Work Instruction Development
Aeronca, Inc. ~ Cincinnati, OH
AS9100 Total System Development and Implementation
Mackie Automotive Systems ~ Lake Orion,
Michigan
Review and update of QS-9000 system
Empire Electrical ~ Auburn Hills, MI
ISO/TS 16949 Total Systems Development and Implementation
Hamlin Steel, Corp. ~ Cleveland, OH
Manual/procedures to ISO/TS 16949
Quasar Industries ~ Rochester, MI
ISO 9001 and ISO/TS 16949 Total Systems Development and Implementation
ICG ~ Dowogiac, MI
ISO/TS 16949 Total Systems Development and Implementation
Doveport Systems ~ Port Huron, Michigan
Development and implementation of physical test and dimensional
validation laboratory
ND Industries ~ Clawson, Michigan
Laboratory and Test Facility Manual to ISO 17025
Procedure Development
Work Instruction Development
Summation Technology Systems ~ Warren, Michigan
Development of systems for collection ant testing of specimens for
Warren District Drug Court.
Procedure Development
Work Instruction Development
Find and acquire equipment
Cornell Supply ~ Toledo, Ohio
ISO 9001:2000 Total System Development and Implementation
Norton Equipment ~ Blissfield, Michigan
Manual/procedures to ISO 9001-2000
Elco, Inc. ~ Jackson, Michigan
Manual/procedures to ISO 9001:2000
Bender Machine ~ Los Angeles, CA
Manual/procedures to ISO 9001:2000
Breasco, Inc ~ Ypsilanti, Michigan